Skip to content
Eternal Infratech Private Limited

Decision model

Model the operational savings of diagnostic inspection.

Estimate direct municipal cost savings when PIE robotic diagnostics replace trial trenching and blind road-cutting.

MUNICIPAL & UTILITY DECISION MODEL

Calculate Avoidable Digging & Outage Costs

Estimate direct operational savings from replacing blind trial trenching with PIE robotic diagnostic tracing.

Field Parameters

120 km
8 cases/mo
3 pits
PIE reduces trial pits down to 1 single targeted cut.
₹ 25,000
₹ 15,000
ANNUALIZED PROJECTED BENEFIT
Avoidable Operating Expenditure
₹ 62.40 Lakhs

Based on 96 annual cases across 120 km network

192Trial Trenches Avoided
3456 hrsOutage Hours Prevented

Forward this estimate to your Chief Engineer or Tender Committee